
A realistic, safe way to train control room staff in all aspects of power station operatiion







Peterhead Power Station is a multi-generator station situated just south of Peterhead in Aberdeenshire. It is owned and operated by SSE plc. Pisys built a full-featured control room simulator alongside the operational control suite to allow for staff training.